Bluebird Ironbark Defence Industry
Placeholder data. This is the phase 1 shell — every figure on this page is illustrative and not yet sourced. Phase 2 replaces it with real AusTender contract data and Australian Bureau of Statistics multipliers; phase 3 adds a regional impact model with labour-market and industrial-capacity constraints, not a flat ratio. See Method for what's being built and Open data for what's already documented.
Modelling

Scenario workbench

This page previews an interface that does not exist yet. The scenario engine arrives in phase 3. It will take a change to the settings — moving a program between precincts, adding spend to a domain in a state, lifting Australian content share, shifting program timing — and report the consequences with their uncertainty. The presets below describe what those runs will cover.

Presets

What the engine will report

Per state and nationally, per year, each with a band: direct, indirect and induced employment; value added and share of state product; occupation demand against available supply; wage pressure; displaced employment in other industries; import leakage; SME flow-through; time to capability; and a feasibility flag naming the binding constraint.

When the engine lands, every number on this page will be computed by the model itself. The language model will explain those numbers and answer questions about them. It will not calculate any of them.